PSKnowHOW - Supported Ways of Working

The purpose of this document is to capture the best practices for KnowHOW KPIs.

The purpose of this document is to provide a well-defined specifications for Jira and other tools, ensuring the availability of data needed to calculate the KPIs in KnowHOW. It enables a Support analyst to accurately assess whether a team's configuration or requested customization is "out of compliance" and should be rejected.

 

Segment

KnowHOW KPI

Best practices for KnowHOW integration

Minimal required Jira configuration

Segment

KnowHOW KPI

Best practices for KnowHOW integration

Minimal required Jira configuration

 

 

 

 

Speed

Sprint Velocity

  • Estimation completed on story points before start of iteration

  • Story point baselining should be practiced (i.e. start with base story with story point 1, and compare rest other stories with base story to estimate)

  • Estimation field in Jira story should be only “Story Point”. Any other estimation field on standard issuetype (i.e. Story etc) should be avoided.

  • Sprint should be added in standard issuetype (i.e. Story)

Commitment Reliability

  • Avoid scope change

  • Each planned story must have Sprint value set before start of sprint.

  • Nothing additional

Sprint Predictability

  • Avoid scope change

  • Each planned story must have Sprint value set before start of sprint.

  • Nothing additional

Issue Count

  • None

  • Nothing additional

Sprint Capacity Utilization

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be captured on sub-task level

  • Original estimate should filled in each sub-task before start of sprint

  • Time spent should captured before each end of the day during sprint execution

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Code Build Time

  • Integration with CI/CD, Repo tools

  • Nothing additional

Scope Churn

  • Estimation planning on story points

  • Sprint tagging to the issues before sprint start

  • Story point should be added for estimation in standard issuetype (i.e. Story)

  • Sprint should be added in standard issuetype (i.e. Story)

Build Frequency

  • Integration with CI/CD tools

  • Nothing additional

  • Jira integration with one of the CI/CD tool (Jenkins, Bamboo, Github Action, Azure Pipeline, Teamcity, Argo CD)

 

 

 

 

 

 

 

Quality

Defect Injection Rate

  • All logged defects must get linked with stories planned in sprint.

  • Provision to mandate that, if defect created then must get linked with story

First Time Pass Rate

  • Run time status update

  • All logged defects must get linked with stories planned in sprint.

  • Provision to mandate that, if defect created then must get linked with story

Defect Density

  • All logged defects must get linked with stories planned in sprint.

  • Root cause field is updated

  • Provision to mandate that, if defect created then must get linked with story

  • Root cause field is configured in defects

Defect Seepage Rate

  • Run time status update

  • All logged defects must get linked with stories planned in sprint.

  • Escaped defect field is configured

  • Provision to mandate that, if defect created then must get linked with story

  • Escaped defect field is configured in defects

Defect Removal Efficiency

  • Defects are planned in sprint

  • Nothing additional

Defect Rejection Rate

  • Defects are planned in sprint

  • Nothing additional

Defect Count By Priority

  • Link all defects with the stories in the sprint by priority

  • Nothing additional

Defect Count By RCA

  • Link all defects with the stories in the sprint by root cause

  • Root cause field is configured in defects

Created vs Resolved Defects

  • Defects are planned in sprint

  • Nothing additional

Regression Automation Coverage

  • In test management tool, select regression, automation options and complete traceability by mapping with story

  • Nothing Additional

In-Sprint Automation Coverage

  • In test management tool, select regression, automation options and complete traceability by mapping with story

  • Nothing Additional

Unit Test Coverage

  • Integration with SonarQube

 

Sonar Violations

  • Integration with SonarQube

 

Tech Debt - Sonar Maintainability

  • Integration with SonarQube

 

Sonar Code Quality

  • Integration with SonarQube

 

Test Execution and pass percentage

  • Integration with test management tool

  • Nothing additional

 

Value

Release Frequency

  • Link Jira issues tagged with the fix version

  • The release should have a start and end date

  • Nothing additional

  • Jira integration with one of the CI/CD tool (Jenkins, Bamboo, Github Action, Azure Pipeline, Teamcity, Argo CD)

  • Check the provision to mandate release start and end date when added fix version.

Value Delivery (Cost of Delay)

  • Epic (considered as feature in JIRA) should have the fields User-Business Value, Time Criticality, Risk Reduction and Opportunity Enablement

  • Epic should have User-Business Value, Time Criticality, Risk Reduction and Opportunity Enablement fields configured

PI Predictability

  • Planned and Actual value should be added in the Epic (considered as feature in JIRA)

  • Epic should have Planned Value and Actual Value fields configured

 

 

 

 

 

 

 

 

 

Iteration

Iteration Commitment

  • Estimation planning on story points

  • Before the start of the sprint, all items should have an estimate and added to the sprint

  • Story point should be added for estimation in standard issuetype (i.e. Story)

Planned Work Status

  • The due date must be added to the issues

  • Duedate should be configured in JIRA

Quality Status

  • All logged defects must get linked with stories planned in sprint.

  • Nothing additional

Dev Completion Status

  • Dev due date must be added to the issues

  • Dev duedate should be configured in JIRA

Work Remaining

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be captured on sub-task level

  • Original estimate should filled in each sub-task before start of sprint

  • Time spent should captured before each end of the day during sprint execution

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Defect Count By Status

  • All logged defects must get linked with stories planned in sprint.

  • Nothing additional

Defect Count By RCA

  • Link all defects with the stories in the sprint by root cause

  • Root cause field is configured in defects

Unplanned Work Status

  • The due date must be added to the issues

  • Duedate should be configured in JIRA

Defect Count By Priority

  • Link all defects with the stories in the sprint by priority

  • Nothing additional

Closure Possible Today

  • The due date must be added to the issues

  • Run time status update

  • Time spent should captured before each end of the day during sprint execution

  • Duedate should be configured in JIRA

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Issues Likely to Spill

  • The due date must be added to the issues

  • Duedate should be configured in JIRA

Wastage

  • Runtime status update

  • Nothing additional

First-Time Pass Rate

  • Run time status update

  • All logged defects must get linked with stories planned in sprint.

  • Provision to mandate that, if defect created then must get linked with story

Risk and Dependencies

  • Link all risk and dependencies in a sprint

  • Nothing additional

Estimation Hygiene

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be captured on sub-task level

  • Original estimate should filled in each sub-task before start of sprint

  • Time spent should captured before each end of the day during sprint execution

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Estimate vs Actual

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be captured on sub-task level

  • Original estimate should filled in each sub-task before start of sprint

  • Time spent should captured before each end of the day during sprint execution

  • Time tracking (Original estimate, Remaining Estimate, Time Spent) field should be added only on sub-task level

Iteration Burnup

  • Due date in all issues in a sprint

  • Nothing additional

Daily Standup

  • None

  • Nothing Additional

 

Developer

Mean Time to Merge

  • Integration with the Repo tool

  • Nothing additional

PIckup Time

  • Integration with the Repo tool

  • Nothing additional

PR Size

  • Integration with the Repo tool

  • Nothing additional

Rework Rate

  • Integration with the Repo tool

  • Nothing additional

Check-Ins & Merge Requests

  • Integration with the Repo tool

  • Nothing additional

 

 

 

 

Release

Release Burnup

  • Link all issues with the release

  • The release should have a start and end date

  • Dev duedate & Due date must be added to issues

  • Estimation planning on story points

  • Dev duedate and Due date should be configured in JIRA

Release Plan

  • Link all issues with the release

  • The release should have a start and end date

  • Dev duedate & Due date must be added to issues

  • Estimation planning on story points

  • Dev duedate and Due date should be configured in JIRA

Release Progress

  • Link all issues with the release

  • The release should have a start and end date

  • Nothing Additional

Defect Count By Status

  • Link all defects with the release

  • Nothing Additional

Defect Count By Assignee

  • Link all defects with the release

  • Defects should be assigned

  • Nothing Additional

Defect Count By RCA

  • Link all defects with the release

  • Root cause field is updated

  • Root case field should configured in JIRA

Defect Count By Priority

  • Link all defects with the release

  • Add priority

  • Nothing Additional

Defect By Testing Phase

  • Link all defects with the release

  • Add Testing Phase

  • Configure testing phase in Defects

Epic Progress

  • Runtime status update of epic in JIRA

  • Nothing Additional

DORA

Change Failure Rate

  • Integration with the SCM tools

  • Nothing Additional

  • Jira integration with one of the CI/CD tool (Jenkins, Bamboo, Github Action, Azure Pipeline, Teamcity, Argo CD)

Deployment Frequency

  • Integration with the SCM tools

  • Nothing Additional

Lead Time for Change

  • Integration with the SCM tools

  • Nothing Additional

  • Jira integration with one of the CI/CD tool (Jenkins, Bamboo, Github Action, Azure Pipeline, Teamcity, Argo CD)

  • Check the provision to mandate release start and end date when added fix version.

Mean Time To Recover

  • Create and close Incident on run time in JIRA

  • Configure Incident issuetype in JIRA

 

 

 

 

 

 

 

 

 

Backlog

Backlog Readiness

  • Estimation completed on story points before start of iteration

  • Story point baselining should be practiced (i.e. start with base story with story point 1, and compare rest other stories with base story to estimate)

  • Estimation field in Jira story should be only “Story Point”. Any other estimation field on standard issuetype (i.e. Story etc) should be avoided.

  • Sprint should be added in standard issuetype (i.e. Story)

Iteration Readiness

  • None

  • Nothing Additional

Production Defects Ageing

  • Link all defects with the release

  • Add Testing Phase

  • Configure testing phase in Defects

Defect Reopen Rate

  • None

  • Reopen transition and status should configured in defects from “In Testing”, “Ready for testing”, In UAT & Closed

Issue Without Story Link

?

?

Refinement Rejection Rate

  • None

  • Nothing Additional

Flow Efficiency

  • None

  • Nothing Additional

Lead Time

  • Runtime status update in JIRA

  • All workflow statuses must get aligned with columns in Agile board.

  • Nothing Additional

  • During Jira board setup, all workflow statuses must get aligned with columns in Agile board.

Flow Distribution

  • None

  • Nothing Additional

Flow Load

  • None

  • Nothing Additional

Cycle Time

  • None

  • Nothing Additional

  • One status should set for DOR

  • One status should set for DOD

  • One status in Jira should set for LIVE OR Jira integration with one of the CI/CD tool (Jenkins, Bamboo, Github Action, Azure Pipeline, Teamcity, Argo CD)

Epic Progress

  • Runtime status update in JIRA

  • Nothing Additional

Backlog Count By Status

  • None

  • Nothing Additional

Backlog Count By Issue Type

  • None

  • Nothing Additional

Defect Count By Type

  • None

  • Nothing Additional