Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Overview

Definition (Hover Text)

measures the time a job takes to build the code

Source Tools

  • Jenkins

  • Bamboo

  • Azure

Graph type

Line

Filters

Job Name

Hover Format on KPI

Date Range: <<min>>

Fields on Overlay

  • Project name

  • Job name

  • Start time

  • End time

  • Duration

  • Build Status

  • Build URL

  • Weeks

Business Logic

Calculation Formula

-

Trend

  • Lesser the time better is the ‘Speed’

Maturity Levels

M1 : > 45 min

M2 : 30-45 mins

M3 : 15-30 min

M4 : 5-15 min, 

M5 : <5 min

Instance level thresholds

Configurations

Processor Fields

-NA

KPI Specific fields

-NA

How to Validate KPI

Suggested ways of working

-

Sample JQLs

-NA

Benefits of KPI

How does the KPI help

  1. Highlighting areas of delay in the code building process.

  2. Facilitating optimizations to streamline build times.

  3. Enhancing overall productivity and delivery speed.

C